Electrical Panel Neutral And Grounding
If your electrical panel is the first service disconnect point and the utility has only provided normally current carrying conductors phase and neutral wires plus a ground wire then no you do not make a neutral to ground connection.
Electrical panel neutral and grounding. Neutral is a circuit conductor that normally completes the circuit back to the source. The panel that s located directly after the electric meter is the main service panel. Grounding a sub panel. The electrical path main panel.
Main panels and sub panels. The main bonding jumper provides a ground connection between the neutral ground bus and the service panel. For multiple panels the situation is more complex. Three wires come from the electric meter and go into the main panel.
By shunting excess line voltage back to the panel s neutral pole the ground current forces the circuit breaker to trip. Another ground connection is made by the grounding electrode conductor or gec. The code defi nes grounding as the connecting to ground or to a conductive body that extends the ground connection and the code defi nes ground as the earth. Installing a ground wire to your electrical service panel can be done easily with a few hand tools.
That is for simple single panel installations. Please see nec article 250 28 for when to make a neutral to ground connection. When grounding an electrical panel the following applies grounding a main panel. Basically grounding is connecting to the earth.
Two live hot wires and one neutral. A second panel or sub panel should have the neutral and ground terminals or bars isolated from each other this is why the main circuit feed to the sub panel must have 4 wires with a dedicated insulated wire for the neutral and a separate wire for the ground. The ground bar is bonded internally when an external bond to earth is installed as described at the link for electrical grounding below. Neutral is usually connected to ground earth at the main electrical panel street drop or meter and also at the final step down transformer of the supply.
There are several different ways main panels are configured in homes here it is in a nutshell. The code defi nes bonded or bonding as connected connecting to establish electrical continuity and. This is a bare copper wire that connects the neutral ground bus bar to a ground rod driven into the earth near the service panel or to metal rebar in the home s.